"Lunan sign upscale paint
Today is
 
    User login
User name:
Password:
Register  Forget password?
      Prouduct list
Blending alkyd paint
Alkyd anti-rust paint
Alkyd enamel
Amino drying paint
Nitro paint
Paint colors hammer
Acrylic Paint
Thermostable paint
Polyurethane paint
Epoxy paint
Chlorinated rubber paint
Chlorine polyethylene paint
High chloride paint
Speecial Paint category
In outer wall latex paint
Powder Coatings
Paint diluent
    Product Show
 Epoxy paint >> Epoxy Floor Coatings >> Epoxy flooring paint
 
    
Number:
LN-hydp
Name:
Epoxy flooring paint
Spec:
20+4
Memo:
Epoxy flooring paint
Class:
Epoxy paint
 
    Product Readme
Epoxy flooring paint
1.Composed:Epoxy resin,pigment,assistant,solvent,curing agent pair of group share paint.
2.Characteristic:Priming paint seal off is good,lacquer adhesion is strong,be firm and able to endure,the water-proof and ability to bear the oiliness is outstanding,and also the antiacid alkali of energy waits for the chemistry product corrode.
3.Use:Apply to protection and the decoration of the floor of the workromm and waehouse,also may be used for the internal cement concrete of building and outside such as workshop,storehouse.
4.Technology requirements :Q/ZLNQ027-2004
 project  Indicators
 Colour and outward appearance  Accord with standard model , lacquer film levelling glossy.

Viscosity  S>=

 Priming paint 20, Face paint 60
 Lustre  Face paint partly only or bright Middle paint brightness
 Drying time h  Outside dry <=4 True dry <=24 Be solidified completely 7d
5.Reference
1).The floor should be dry,clean,without the loose thing,greasy dirt,protruding and so on.
2).Priming paint scribbles to a high degree or the brush scribbles,lacquer boils to scribble,the air flame plating or the brush scribbles,middle japan shaves or rubs to level out the floor.
3).The construction site's temperature should be between 50C and 300C,the air relative humidity should be lower than 85%.
4).Gap of spread and loadŁș
 Bottom material temperature  5  20  30
 The shortest interval h  36  24  16
 The longest interval d  14  5  3
5).Apply to four hours of scheduled time.
6.6.Transport,storage
  When transporting,Prevent from rain,Prevent Sunlight suns violently,Avoid collision,should according to the traffic regulations. 
  Storage in the cool ventilation,dry place,prevent sunlight from irradiating directly,Isolated fire source,far away from a heat source.
7.Safety protects
Space has fine ventilation facilities,the staff wear glasses,glove,gauze mask,avoid skin contacting and sucking lacquer fog in. The scene strictly forbids fireworks.
Remark:Brochures is our experiment and the experieme accumulation,also as construction reference.with the product quality ceaseless improve,the relative index will change,so we can not notify to you on time.
Hits:663  UpdateTime:2007-7-6  Print   Close
Home About us Product list Product class Honor Market Feedback User center
Copyright 2007-2010 www.Paint5.com All Rights Reserved Tel:0539-2220117,(86)18953952255 Email:tuliao#189.cn(#replaced@)
Add:Gaoqiao Industrial Zone,Yishui Country,Shandong Province,P,R,China Postcode:276400
QQ:23182234lunan paintQQ:289022711lunan paint